12V-100AH BRAGA MORO蓄电池/进口电池、低价销售
12V-100AH BRAGA MORO蓄电池/进口电池、低价销售
12V-100AH BRAGA MORO蓄电池/进口电池、低价销售
本公司主要销售一下产品:
1:德国阳光蓄电池
3:大力神蓄电池
2:圣阳蓄电池
4:山特蓄电池
5: BB蓄电池
6;GJ蓄电池
7:汤浅蓄电池
8:友联蓄电池
9:松下蓄电池
10:山特UPS电源
11艾默生UPS电源
12:APCUPS电源
13:科士达蓄电池
14. 华宇蓄电池
15.希顿蓄电池(进口胶体)
16.赛特蓄电池
17.美国海志蓄电池
18'德国松树荷贝壳蓄电池
19.梅兰日兰蓄电池
20.英国霍克蓄电池
21.法国路盛蓄电池
22.英国狮克蓄电池
23.英国KE蓄电池
24.法国时高蓄电池
25.美国GNB蓄电池
26.意大利非凡蓄电池
27.台湾 CSB蓄电池
28.广东理士蓄电池
A. battery capacity co
nversion curve
B. for 5 seco
nds and 1 minute discharge characteristic curve
C. Float charging pressure and temperature curve
D. Floating battery life and temperature curve
E. Different ratio for battery discharge impulse discharge current curve after 1 hour
F. Different ratio for battery discharge impulse discharge current curve after 0.5 hours
G. Battery capacity and discharge time curve
H. Different battery discharge rate, voltage and time relation curve
For all provide engineering special seal shall be affixed to the drawings, and for the final drawings.
7.1 the basic requirements
7.1.1 during this part for the implementation of the co
ntract party to the quotation of the equipment supplied by inspection and performance test experiment was carried out, ensure the equipment to be provided by quotation in compliance with the requirements of the technical specification. Equipment and its main compo
nents are co
nducted in accordance with relevant state standard type test, factory test, all kinds of test are co
nducted according to relevant standards and regulations of the state. Each group, all battery factory experiment was carried out, and to provide a complete test report and factory test reports and test acceptance criteria.
7.1.2 offer party shall within one mo
nth after the co
ntract comes into force, to make an inquiry in co
nnection with this co
ntract equipment to be supplied by inspection, performance acceptance test criteria, and in the test report will be a mo
nth ago test standards, plans and reports to send inquiry party inspection. Relevant standards shall comply with the provisions of the technical specification.
7.1.3 offer will match all equipment field test of the machine.
7.1.4 inquiry think a test condition, content, procedure, measure and record any item is not in co
nformity with the relevant requirements, shall have the right to refuse to accept the test report to redo the test.
7.1.5 inquiry party shall have the right to send perso
nnel to offer party factory, test site and laboratory equipments and its main compo
nents manufacturing, assembly, testing and debugging of the production process such as spot check.
7.1.6 inquiry staff put forward the relatio
nship to the problem of equipment quality, price will reply within 1 week.
7.2 the factory inspection and test
7.2.1 quoted battery is required to provide a full range of equipment type test, factory test, the commissio
ning test report, test programs, content, methods, standards and other requirements, in accordance with the relevant countries and the electric power industry standard specification. Battery delivery until they have passed the test before they go out. The type testing shall not be less than the following items:
A) 10 h rate capacity test
B) the accident impact discharge test
C) discharge characteristic curve test
D) open circuit voltage test
E) pressure drop test
7.2.2 before delivery test items include:
A) polarity test
B) the open circuit voltage test
C) 10 h rate capacity test
D) the acid mist performance
E) safety performance test
7. 3 field test
Equipment in the field after installation, test according to related standards. Test results and co
nform to the state and the mechanical ministry standard requirements.